Alternative Active Effluent Discharge Line Installation Works and Final Design

Notice details

Published
Category
works
Buyer region
North West

Public buyer and contract winner

awarded to

Contract winner

Costain Limited

Award value£9,458,845

  1. Awarded
    Completed
  2. Start
    Current phase
  3. End
    Upcoming

Work description

The Cooling water system at NRS Hunterston B site is no longer required for any cooling function. Therefore, the intention is to remove the Cooling Water pumps and there is a requirement to provide Alternative Active Effluent Discharge Lines (AAEDL) to the sea discharge point.

This contract is for final concept design services and the marine installation of new pipe, valve and other minor works for the AAEDL seaward side, at the Hunterston B Nuclear site. This is to include:

- End of line isolation and backflow protection - Culvert fixings - Pipe fitting and valve repair/replacement/installation - Pressure testing and maintenance strategy - Any required pre-works

The Contract has been awarded via Mini-Competition under the NRS Decommissioning and Asbestos Removal (DAR) Framework Lot 1 - conventional deplanting, asbestos removal and demolition.