# EV076 28\. Phase 2 Ductwork Infrastructure to facilitate Solar PV, Battery Storage and EV Charging installations

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [North Tyneside Council](/buyers/north-tyneside-council/contract-awards)
- Contract winner: [BCE Northern Ltd](/contract-winners/bce-northern/public-sector-contract-awards)
- Award value: £304,111
- Tender value: £250,000
- Award date: 25 August 2022
- Published: 25 August 2022
- Contract start: 1 September 2022
- Contract end: 30 November 2022
- Stage: awarded
- Procurement category: works
- Notice ID: 3a859b11-c950-4d13-bf35-e188e9d9e695-566714
- OCID: ocds-b5fd17-e999ec63-2c34-4bdc-a8dd-276fc815c9fa

## Description

Phase 2 Ductwork Infrastructure to facilitate Solar PV, Battery Storage and EV Charging installations for EV076 Operational Depot Accommodation Project / The Killingworth Sustainable Retrofit Project The Authority has secured funding from the European Regional Development Fund \(ERDF\) to support delivery of the Killingworth Site Sustainable Retrofit Project\. This project is a combination of refurbishment and replacement of existing office accommodation, workshop, welfare and other facilities on the site ensuring it 'future proofs' depot operations\. Energy efficiency and functionality are key principles, and the Project will use a wide range of energy efficient, generation and storage/distribution solutions to support a move to an electric powered operational fleet whilst reducing the site carbon footprint\. This procurement opportunity relates specifically to Block F Vehicle Maintenance Workshop Refurbishment and North Tyneside Council will act as Principal Contractor for the project, therefore tenderers should note that they will be working in the capacity of Sub-Contractor\. Tenderers must be aware that this is an operational building and as such works must be undertaken taking into consideration the ongoing workshop operations which will require work phasing and innovative delivery solutions to ensure disruption to the service is kept to a minimum\. We expect tenderers to liaise closely with the service and out of hours and weekend working will at times be necessary\. The Block F site is very restrictive for access / plant movements and therefore it is strongly recommended that Tenderers undertake a site visit, contact details to make arrangements are contained within the Preambles document in the tender pack\. This package is anticipated to be completed in 12 weeks between 01 September 2022 and 30 November 2022 \(Provisional\)\. Additional information: The tender documents can be obtained using the link below and will become available as soon as you express an interest: https://procontract\.due-north\.com/Advert?advertId=80d581c5-01fe-ec11-8116-005056b64545

## Related contract awards

- [NHS SBS - Tech Devices 4: Hardware Refresh 2026/27](/contracts/ocds-b5fd17-90d4d42b-287c-4cf2-818c-979567cedb74): NORTH TYNESIDE COUNCIL
- [Building Safety Levy Regulations Module](/contracts/ocds-b5fd17-bcb6599c-1009-4c6f-940c-323663bcb32a): NORTH TYNESIDE COUNCIL
- [\*\*Direct Award\*\* Marden Estate Phases 1&amp;2 - Asbestos Removal](/contracts/ocds-b5fd17-3353a9fb-0ab1-4b84-92a6-3e99a396b8da): NORTH TYNESIDE COUNCIL
- [25-077 Dudley Chapel Refurbishment Underpinning](/contracts/ocds-b5fd17-f433b7fe-300d-4513-8b6b-a623acf5cd72): NORTH TYNESIDE COUNCIL
- [Reynolds Avenue - Groundworks, Drainage and Foundations](/contracts/ocds-b5fd17-a3b98a0a-c02d-4830-8f35-904ba9858ce2): South Tyneside Council
- [Lizard Lane - Groundworks, Drainage and Foundations](/contracts/ocds-b5fd17-bb2a3959-cc20-4293-a678-5f0868096425): South Tyneside Council

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/3a859b11-c950-4d13-bf35-e188e9d9e695-566714)