MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 1 (Marsh Lane Bridge)
£311,574
Contract Details
- Tender Value
- £311,574
- Stage
- Live
- Published
- Awarded
Timeline
Description
North Somerset Council procured a contractor to deliver the design and construction works to upgrade highways and bridges as part of the MetroWest Phase 1B project. The overall objective of MetroWest Phase 1B is to re-open the Portishead rail line and provide an hourly service between Portishead and Bristol Temple Meads, with new stations at Portishead and Pill. The Project will connect 50,000 residents to the rail network and forms part of a wider MetroWest programme to deliver strategic enhancements to the local rail network. The highway and bridge works comprise of two works packages. Package 1 is the highways scope which includes detailed design (stage 1) and construction (stage 2). Package 2 is the bridges scope which includes stage 2 construction only (covered by 3 separate contracts). This notice relates to the award of the Stage 2 Package 2 Bridges construction contract 1 of 3 (Marsh Lane Bridge).
Related Contracts
From This Buyer
From This Supplier
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 2 (Sheepway and Old Station Road Bridges)
£1,475,605 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 1 Highways Contract
£1,936,200 ·
- EVL/2092 - Canterbury - Folkestone
£235,925 ·
- HRE - SDJ2/30 - Warrington - Timperley
£67,216 ·
Ref: f6739d95-c1ea-4ff0-9d02-16d735ac39c9-896355 · Sourced from Contracts Finder
View source notice