Skip to content

Tender notice

South Road Retaining Wall, Weston-super-Mare. Ground Investigation Works

Notice details

Published
Category
works
Buyer region
South West

Public buyer

Tender value£40,000

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

The Proposed Ground Investigation works contract comprises the following works: • 5 No. boreholes advanced using a drilling rig capable of both dynamic sampling and rotary coring that can obtain the required samples through possibly made ground/fill, superficial deposits and solid geology to a depth of 7 mbgl. Collection UT100 undisturbed samples where possible/appropriate, SPT testing and collection of rock cores. Boreholes shall be a minimum of 1.5m back from the retaining wall. • 5 no. hand dug observation pits of the retaining wall foundations. • 3 no. horizontal diamond core holes through the retaining wall to confirm wall thickness and the nature of the materials directly behind the wall. • Soils to be logged in accordance with BS EN ISO 14688-1:2002+A1:2013 and BS 5930:2015. • Rock to be logged in accordance with BS EN ISO 14689-1:2002, BS 5930:2015. • Geotechnical laboratory testing on selected samples. • Environmental testing on selected samples. • Provision of AGS data. • Ground Investigation Factual Report (as per 16.8.1) Specific borehole requirements are detailed further in Schedule 1 and Schedule 2 of Ground Investigation (GI) Specification. The proposed borehole location plan is attached to the GI.

Related awards

Source: Contracts Finder · Notice 9bde243f-74d9-40fe-84b0-539339b92856-352027

View source notice