# Task Order from PDF framework for M53 SB to M56 EB DS

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [National Highways](/buyers/national-highways/contract-awards)
- Contract winner: [BREEDON COLAS LIMITED](/contract-winners/breedon-colas/public-sector-contract-awards)
- Award value: £764,716
- Tender value: £792,231
- Award date: 30 April 2025
- Published: 20 October 2025
- Contract start: 6 June 2025
- Contract end: 19 August 2025
- Stage: awarded
- Procurement category: works
- Notice ID: dc4f333a-23a5-4d30-b101-4739429ac1eb-868753
- OCID: ocds-b5fd17-d282dff4-f358-4079-a27f-dc681fde124c

## Description

1\. Principal Contractor and welfare provision \(Octavius Infrastructure Limited\) 2\. Clearance of nearside and offside overburden and minimal vegetation clearance where required only \(Octavius Infrastructure Limited\)\. 3\. Resurfacing as per design and specification, including various inlay depths and 0\.5m inlay into hardshoulder where it drains to nearside and to edge of carriageway where drains to offside for road safety audit purposes \(Breedon Colas JV\) 4\. Installation of road markings and studs\. Works to include replacing surface mounted studs with milled in studs from a previous scheme as indicated on drawings \(Premier Roadmarkings Limited\)\. 5\. Provision of traffic management including equipment for protection of overhead structures and powerlines, pedestrian management and diversion signage \(H W Martin\)\. 6\. Installation of detector loops and commissioning \(Mason Street Furniture\) 7\. Pegging and marking for sign works \(Mason Street Furniture\) 8\. Remove redundant post in front of sign, remove existing sign and posts and install 1nr traffic sign as per design\. Traffic sign to be installed outside the working width of existing barrier\. Traffic sign on offside to be removed is illuminated\. Octavius to liaise with NH for handover to disconnect \(Octavius Infrastructure Limited\) 9\. Bridge joints to be replaced as following \(VolkerLaser\): - Little Stanney Bridge - 2nr full depth APJ replacement\. The asbestos survey shows north joint depth of 95mm and south joint depth of 105mm\. PC to inspect the joints when planed off surface course and see if can confirm that they are definitely APJs\. If no APJ is evident seek advice and determine way forward\. - Shropshire Union Canal - 2nr top off APJ only - Stoak A \(M56 MP 56/1\) - no works required at mechanical joint but check condition on site of nosing material following resurfacing works\. 1nr full depth APJ replacement as joint is leaking when viewed from underneath structure\. When replacing this joint make sure it is installed in correct alignment and not skewed like the current crack seal\. 10\. All gullies, side entry kerbs, drainage channels etc within scheme extents need to be checked and cleared upon completion of the works to ensure that there are no obstructions/blockages \(Octavius and Breedon Colas\)

## Related contract awards

- [PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt](/contracts/ocds-b5fd17-17b0789c-c4e1-4d50-acd5-06e497aace8c): National Highways
- [PDF Framework - A27 Falmer Footbridge Headroom](/contracts/ocds-b5fd17-ac2eb537-ce78-41bb-8f91-d6d652725e96): National Highways
- [PDF Framework - RM1016 Holyport interchange](/contracts/ocds-b5fd17-c92e4616-bb2e-4533-8dce-53b55a72aa09): National Highways
- [PDF Framework - A64 Grimston to Hopgrove Pavement](/contracts/ocds-b5fd17-2ded18e4-f25d-4d20-8e8a-1a63ec5bd209): National Highways Limited
- [PDF Framework - A1\(M\) Catterick to Ripon NB](/contracts/ocds-b5fd17-ba1541ba-a484-46c6-aa99-76aa058ee43c): National Highways Limited
- [PDF Framework - A663 Chadderton Access](/contracts/ocds-b5fd17-cd10028d-385f-43f3-bf68-0bdc2e3ae486): National Highways Limited

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/dc4f333a-23a5-4d30-b101-4739429ac1eb-868753)