SC23206 - DFC2023 - Mini Competition - Fir Tree Road, Tunbridge Wells Scheme
£55,000
Contract Details
- Tender Value
- £60,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The Drainage Works Framework 2023 (SC22331) is used to support Kent County Council's current contracts (Highway Term Maintenance Contract, Road Asset Renewal Contract and others) to maintain it network. The drainage works consist of the provision of labour, resources, plant and materials to carry out all works associated with drainage maintenance works and general reinstatement works on both highway and non-highway sites. Works under £25k are awarded via direct award on a rotation basis. Works over £25k are awarded via a mini-competition process. This notice pertains to a mini-competition exercise that was carried out under the Drainage Works Framework 2023. Details of this mini-competition are below listed below: - Aim: to find a Contractor to deliver the Fir Tree Road Tunbridge Wells scheme. - Dates: The scheme needs to be delivered between the 29 January 2024 to 04 March 2024. - The scheme will deliver the following outputs, please note that this is not an exclusive list: • Road closure, advanced warning signs, and letter drops. • To carry out two trial hole trenches across the full width of the carriageway. • To replace three existing gullies with new 450mm x 900mm gully pots, and to also install another four new 450mm x 900mm gully pots. • To install two new Type 2a chambers in the carriageway. • To install a new 2.4m dia, 4m deep Type 1 Soakaway (conventional) on the verge of the Commons to KCC standard. Before excavating for the soakaway, the existing turf is to be cut out, rolled up and set aside for re-use. Some of the best of the soil is also to be set aside for reinstating. • To install a total of 49m. new 225mm Twinwall pipe at various locations within the carriageway. • To install a total of 41.45m of new 150mm Twinwall pipe from the gullies to the new chambers and from the gullies to the new 225mm and 150mm pipes as indicated on the plans. • The existing drainage pipe from existing gully to gully crossing the junction of Fir Tree Rd is the be sealed up at end when the gully is replaced. • To reinstate the trenches of the Type 4 carriageway to KCC standard detail
Related Contracts
From This Buyer
- Personal Safety Devices
£47,151 ·
- Turner Contemporary Car Park
£500,000 ·
- EDC Landscaping
£250,000 ·
- SESLIP DPS - Transformation Network Management
£46,875 ·
From This Supplier
- DFC2023 - SC240116 - Gloucester Avenue, Margate - Mini Competition - Works over £25,000.00
£396,097 ·
- DFC2023 - CN24162 - Whitehall Road, Canterbury - Mini Competition - Works over £25,000.00
£34,934 ·
- SC22331/1 - Drainage Works Framework 2023 - Call off Contract (SC22331/1 -5)
£750,000 ·
- SC22331/1 - Drainage Works Framework 2023 - Call off Contract (SC22331/1 -4)
£500,000 ·
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: 93afdced-a3ec-495a-b774-05b454b7d2b2-711625 · Sourced from Contracts Finder
View source notice