# WP15 Final Highways Scope - Old Oak Common \(S4\) Station

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [Balfour Beatty VINCI Systra JV](/buyers/balfour-beatty-vinci-systra-jv/contract-awards)
- Tender value: £20,000,000
- Published: 21 August 2025
- Planned start: 16 August 2026
- Planned end: 1 December 2028
- Stage: open_tender
- Procurement category: works
- Notice ID: 44b34daa-4df3-432a-8263-cf7c34fde72a-860311
- OCID: ocds-b5fd17-b9e74b50-fd16-4bb2-9e8b-7bc6a60c5dbb

## Description

WP15 Final highways scope The OOC Lane realignment &amp; Final highways scope package consists of: Removal of all existing highway surfacing and street furniture \(is there any to be retained / relocated or does it include disposal?\) Installation of any temporary critical highway furniture \(e\.g\. Street Lighting, Barriers\) required to carry out the works Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence\. The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing All temporary works required for the construction of the works, including any access requirements Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements Removal and disposal of all current utilities in the highway\. Installation of OOC Lane footpath retention structures Installation of any other required Highway Civils Installation of all highway and foul drainage Installation of UKPN 132kV &amp; 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works The removal of any installed temporary works and the construction of the highway The installation of all highway furniture and its required infrastructure      \(traffic lights incl of ducting, islands, street lighting incl of ducting etc\) Removal of temporary works installed by others to facilitate utility connections at the north and south end of the

## Related contract awards

- [Fit Out - WP12\.7\.1 - Painting and Sealants - Old Oak Common \(S4\) Station](/contracts/ocds-b5fd17-f88ccbf5-7bb4-496d-96fa-922fd8b0638b): Balfour Beatty VINCI Systra JV
- [Consolidation &amp; Logistics Facility - Old Oak Common \(S4\) Station](/contracts/ocds-b5fd17-80550173-aeb4-47bd-8861-a86031776293): Balfour Beatty VINCI Systra JV
- [Fit Out - WP12\.5 Architectural Metalwork - Old Oak Common \(S4\) Station](/contracts/ocds-b5fd17-5fd91183-4ec6-4fd6-b9f4-85cb2cfbaeff): Balfour Beatty VINCI Systra JV

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/44b34daa-4df3-432a-8263-cf7c34fde72a-860311)