Contract award record
GB-London: New Museum Project - Our Time Exhibition Principal/Main Works Contractor
Tender value £5,000,000
Notice details
- Published
- Category
- works
- Buyer region
- London
- Source
- View official notice
Public buyer and contract winner
Award valueNot disclosed
- StartCurrent phase
- EndUpcoming
Work description
The Our Time Exhibition Main Works Contractor will be required to act as the Our Time Gallery Principal/Main contractor for CDM purposes in relation to the Our Time Exhibition.
The sucessful candidate will be responsible for the fabriaction, installation and comissioning of the majority of works for the Our Time Exhibition fitout. Please see summary below: •Drawing Coordination of all exhibition works, plus Client-direct works / appointments •Principal Contractor duties for the specific Our Time exhibition space only •Exhibition walls •Acoustic treatment •Setworks •Seating •Exhibition 3rd fix mechanical and electrical •Exhibition lighting and luminaires outside of showcases. All emergency lighting is by the Basebuild •Exhibition graphics and substrates •Vibration isolation due to the proximity of a railway to part of the Past Time exhibition •"As built" drawings •BIM
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.