Rigging alterations in New Adelphi Theatre
£23,260
Contract Details
- Tender Value
- £27,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
We require alterations to the grid in the New Adelphi Theatre, which will entail the reconfiguring of electric pilewind winches and hemp sets in order to achieve a more useful distribution of available bars. Hemp sets will need to be decommissioned and the pulley block layout re-configured in order to divert an existing electric pilewind winch further upstage, with hemp sets then being reinstalled further downstage. All load testing, SWL signage and certification should be included. This project should also include an update to the hoist control system to allow for two control positions (fly floor and stage).
Related Contracts
From This Buyer
- Infonetica renewal
£239,591 ·
- Mary Seacole PSDS [LED & LV]
£780,973 ·
- Autumn Open Day Campaign Media Buy
£246,188 ·
- Benefits Platform Replacement
£126,000 ·
From This Supplier
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: 51b1d24c-9f3a-4e2e-9cb2-a5d77fa84fe5-829813 · Sourced from Contracts Finder
View source notice