Skip to content

Contract award record

SDF Lot 12.1 South West_ Amey OW Ltd A

Notice details

Published
Category
works
Buyer region
West Midlands

Public buyer and contract winner

Public buyer

Highways England
awarded to

Contract winner

Amey OW Limited

Award value£25,002,110

  1. Awarded
    Completed
  2. Start
    Current phase
  3. End
    Upcoming

Work description

National Highways continues to roll out the Asset Delivery model to its operational areas. There is a requirement to deliver a range of renewal, improvement and selected small scheme construction works on the Strategic Road Network in areas utilising specialist contractors working collaboratively with National Highways to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS) periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided into a number of workstreams that align with the contractors' specialisms, and will also include design. Bandings have been introduced into the framework model to differentiate some contracting terms between bands.

This award is for Lot 12.1 Design Services (region) in the South West region (National Highways Areas 1 and 2).

This Lot covers the design of highway maintenance, renewal and small improvement and associated services including; - Structures, - Landscaping, - Pavements, - Drainage, - Traffic Modelling, - Traffic signals, - Geometrical designs, - Geotechnics, - Technology, - Lighting, - Motorway communications, - Environmental, - Noise quality (including non-invasive surveys), - Air quality (including non-invasive surveys), - Vehicle restraint systems, - Depots, - Preparation of contract documents, and - Site supervision, and - Stakeholder engagement/consultation Other duties This scope also includes: - Mobilisation - Design validation - Principal designer - Manage Network Occupancy - Community - Contingency, and - Demobilisation The scope may also include providing design support as part of Incident Response (Rapid Response) when instructed.

Despite the award of the framework being earlier, contracts are issued inline with regions going live.

Related awards

From this public buyer

View all awards from this public buyer

From this contract winner

View all awards to this contract winner

Source: Contracts Finder · Notice 5778b79d-dd49-41bb-8d55-261122f649bb-574806

View source notice