ContractPulse
Awarded

D3000 / D3001 Cladding Modifications

£345,536

Dounreay Site Restoration LimitedNorbloc Construction Ltd
works

Contract Details

Tender Value
£400,000
Stage
Awarded
Published
Awarded

Timeline

Awarded
Start
Disclosed
End

Description

The existing insulated cladding on two operational facilities on the Dounreay site has fallen into a state of disrepair. 'Patch' repairs will not be sufficient to see the buildings forward over their remaining operational life. A design has been produced that entails fixing single skin profiled steel cladding over much of the existing façade and roof of the facilities (approximately 2,600m2 in total). This will be attached using a proprietary rail and bracket system fixed onto the surface of the existing cladding. The rail and bracket system will itself be fixed back onto existing cladding rails and purlins. The system shall be made weather tight through the use of purpose made flashings. A Contractor is required to install the cladding. The scope of works shall be the procurement and erection of the cladding, flashings and guttering including supply of plant, tools and labour.

Related Contracts

Ref: 0a84aaf1-3465-4d1a-9362-94a938a58e8d-196333 · Sourced from Contracts Finder

View source notice