# MARE HARBOUR RO RO FACILITY UPGRADE AND REFURBISHMENT, FALKLAND ISLANDS

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [MINISTRY OF DEFENCE](/buyers/ministry-of-defence/contract-awards)
- Contract winner: [Volkerstevin Ltd](/contract-winners/volkerstevin/public-sector-contract-awards)
- Award value: £19,136,917
- Tender value: £19,136,917
- Award date: 22 March 2016
- Published: 18 November 2016
- Contract start: 22 March 2016
- Contract end: 30 September 2017
- Stage: awarded
- Procurement category: works
- Notice ID: e6dfda97-9994-41ba-a5e4-9a6fb1c4629f-94714
- OCID: ocds-b5fd17-96631d6f-adc9-11e6-9901-0019b9f3037b

## Description

To undertake all design and build tasks associated with upgrade and refurbishment of the Mare Harbour Ro-Ro Facility for continued use by the Falklands Island Re-Supply \(FIRS\) Point Class vessel detailed below: • To provide Mare Harbour Falkland Islands with a RO-RO facility suitable to cater for berthing, mooring and offloading of the FIRS Point Class vessels\. • To provide Mare Harbour Falkland Islands with a facility that is capable of supporting Small Boat Operations\. In order to meet these Requirements, the Works to be executed under this Contract shall include, but not be limited to, the design, construction, installation, testing, commissioning and remedying of defects of the following items: Works including, amongst other requirements: • Provision of a quay structure to act as a berthing face for the safe berthing of the FIRS Point Class RO-RO vessels • Provision of supporting quay structures for mooring points to enable safe mooring • Provision of pedestrian access gangways between the existing T-head jetty, the mooring points and the berthing face • Provision of Fendering and mooring equipment, and safety equipment • Minor repair to the quay face at the stern ramp for the RO-RO • Cathodic protection to all existing sheet piled structures \(including the T-head jetty\), where these are retained for use in the facility • Provision of a new small boats jetty comprising a pontoon on piled moorings and a linkspan, to support small boat operations • Associated M&amp;E services • Demolition and disposal of existing structures where these are not re-used The design must consider the significant logistical and environmental constraints which are present at operational ports\. The requirement is for a 25 year design life for all elements of this project\. All designs are to comply with relevant EU, UK and FI legislation\.

## Related contract awards

- [715948485 Alexander Barracks Demolitions Work Package](/contracts/ocds-b5fd17-c1f0ef50-4e32-4f82-87bf-1d6902fbd344): Ministry of Defence
- [Buckley Barracks SLA - RIBA Stage 3-4](/contracts/ocds-b5fd17-00d628de-48f7-4599-b847-bf73b2cb533d): Ministry of Defence
- [HR Support Level 3 Apprenticeship](/contracts/ocds-b5fd17-cd7caa2c-c76a-4709-8032-9a2b7f19cb9c): Ministry of Defence
- [NW CDF Lot 2 Sankey Phase 1 ESE](/contracts/ocds-b5fd17-239e1b45-7876-4e5b-bf80-563478db3046): Environment Agency
- [Looe Flood Defence - Early Contractor Involvement](/contracts/ocds-b5fd17-a06d5c97-82d6-4d1b-b92f-fac55b7066ac): Cornwall Council
- [HMNB Devonport - 3 Basin Rehabilitation of Vessel Entry Point](/contracts/ocds-b5fd17-9432494a-c74c-41cc-9b56-ed76dac5fef6): Ministry of Defence

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/e6dfda97-9994-41ba-a5e4-9a6fb1c4629f-94714)