MARE HARBOUR RO RO FACILITY UPGRADE AND REFURBISHMENT, FALKLAND ISLANDS

Notice details

Published
Category
works
Buyer region
Not specified

Public buyer and contract winner

awarded to

Contract winner

Volkerstevin Ltd

Award value£19,136,917

  1. Awarded
    Completed
  2. Start
    Completed
  3. End
    Completed

Work description

To undertake all design and build tasks associated with upgrade and refurbishment of the Mare Harbour Ro-Ro Facility for continued use by the Falklands Island Re-Supply (FIRS) Point Class vessel detailed below:

• To provide Mare Harbour Falkland Islands with a RO-RO facility suitable to cater for berthing, mooring and offloading of the FIRS Point Class vessels.

• To provide Mare Harbour Falkland Islands with a facility that is capable of supporting Small Boat Operations.

In order to meet these Requirements, the Works to be executed under this Contract shall include, but not be limited to, the design, construction, installation, testing, commissioning and remedying of defects of the following items:

Works including, amongst other requirements:

• Provision of a quay structure to act as a berthing face for the safe berthing of the FIRS Point Class RO-RO vessels • Provision of supporting quay structures for mooring points to enable safe mooring • Provision of pedestrian access gangways between the existing T-head jetty, the mooring points and the berthing face • Provision of Fendering and mooring equipment, and safety equipment • Minor repair to the quay face at the stern ramp for the RO-RO • Cathodic protection to all existing sheet piled structures (including the T-head jetty), where these are retained for use in the facility • Provision of a new small boats jetty comprising a pontoon on piled moorings and a linkspan, to support small boat operations • Associated M&E services • Demolition and disposal of existing structures where these are not re-used

The design must consider the significant logistical and environmental constraints which are present at operational ports. The requirement is for a 25 year design life for all elements of this project. All designs are to comply with relevant EU, UK and FI legislation.