Skip to content

Tender notice

Fit Out - Ancillary Metalwork -WP12.3 - Old Oak Common (S4) Station

Notice details

Published
Category
works
Buyer region
East of England

Public buyer

Tender value£5,000,000

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

WP12.3 Ancillary Metalwork

Scope of work:

The ancillary metalwork package consists of non-architectural metalwork fixed utilitarian access, balustrades/ guardrails, handrails, barriers, guards, and staircases predominately to back of house (BoH) areas for the HS2 station incorporating the Great Western Main Line (GWML) conventional station and Shared Accommodation Building (SAB), and comprises of the following scope:

Detailed design, supply and installation of station ancillary metalwork to the SAB, GWML and HS2 station areas, including all associated testing and certification of the works.

Metalwork to be fully coordinated with substrates and BoH finishes, including Mechanical, Electrical, Plumbing & Heating (MEPH).

Provide RIBA 5 design including but not limited to fabrication drawings showing general arrangements, elevations, interface details, fixings details, components and performance requirements for construction.

Additional information: No Documentation is included at this point.

Related awards

Source: Contracts Finder · Notice 5dfb3ad0-d427-42c4-abb7-39b5702abdf2-650921

View source notice