ITQ Section 106 Kingsway Pedestrian Improvements
£5,000
Contract Details
- Tender Value
- £50,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The works are to install dropped crossing points with concrete buff tactile paving, pedestrian guard rail and buff surfacing SPM-HC_S106-160-24-100-001 Suppliers are required to price the BOQ and include for all traffic management. It is highly recommended that the PCI pack is studied, and a site visit takes place before submitting quote. A proposed programme of work should also be submitted with your tender. These works are being funded, delivered and managed through the Herefordshire S106 Team directly. S106 contributions by their very nature are a finite budget which require the project to obtain a high level of value engineering at every stage of the project's lifecycle. Works to be completed between 01/05/26 - 01/08/26
Related Contracts
From This Buyer
In This Category
- CBC-2087-Q-SM Wet Floor Shower Delivery - AWARD
£0 ·
- Core Hole Drilling
£132,000 ·
- Cyclical Decoration Works Contract
£560,000 ·
- Surface Works throughout Taunton
£70,000 ·
Ref: 0304ed70-d5c2-4f3d-a36f-16b0070191c3-899878 · Sourced from Contracts Finder
View source notice