W99 Pannel Build
Contract Details
- Stage
- Open Tender
- Published
Timeline
Description
The SMF is used to transfer material to the AHF facility. It must be purged with nitrogen (N2) prior to export from the AHF to protect the SMF internals. The nitrogen purge system has been designed for this purpose. It comprises several panels with valves and instruments, connected by pipework. The gas supply is provided from standard transportable gas bottles. Specification Outline This specification defines the manufacturing and delivery requirements for the principal pipework panels for performing the N2 purge of the SMF. This document has been produced with reference to the client design requirement specification and the functional specification. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design it is considered unnecessary for any further design except that necessary by the fabricator for manufacture. This specification defines the manufacturing, works testing and delivery requirements for the SMF Nitrogen Purge System Test Aid. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design, it is considered unnecessary for any further design except that necessary by the contractor for manufacture (e.g. profile drawings for stainless steel plates).
Related Contracts
From This Buyer
From This Supplier
In This Category
Ref: e7dc2bbd-ff43-44f2-8173-7aa3bc1f34c7-798707 · Sourced from Contracts Finder
View source notice