Lot 2A- The Undertaking of Road Safety Studies 2026-2027
£57,488
Contract Details
- Tender Value
- £48,000
- Stage
- Live
- Published
- Awarded
Timeline
Description
To undertake Engineering Safety Studies (ESS) in response to multiple safety concerns of the public or partners, as brought to the attention of the local Cumbria Road Safety Partnership (CRSP) Group or triggered by collision criteria being reached. Studies which look to find similarities between collisions that have occurred at a single site or across a route which would indicate that there may be a determinable problem with an aspect of the infrastructure, such as road markings or traffic signs. The study will identify and present initial options for remedial measures indicating First Year rate of Return and recommended scheme(s) within a Report.
Related Contracts
From This Buyer
- Lot 1a - Up to 8 passenger seats for various areas closing 9 October 2023 - F58
£0 ·
- Lot 4B- LCWIP 2 Kendal Riverside North Active Travel Preliminary Design
£150,000 ·
- Lot 1a - Up to 8 passenger seats for various areas closing 04 October 2023 - F55-10
£0 ·
- Lot 1a - Up to 8 passenger seats for various areas closing 18 September 2023 (F53-3)
£0 ·
From This Supplier
- Development Control officer
£30,000 ·
- Highways Programme Manager
£194,126 ·
- Swift cEMV Contactless Payment Broker _Consultancy Support Phase 3
£81,005 ·
- Mass Transit Commercial Support
£104,000 ·
In This Category
Ref: e79ad84c-0396-402b-8f5e-8154bcb49729-883191 · Sourced from Contracts Finder
View source notice