# Task Order from PDF framework for \(619572\) M60 River Irk Waterproofing Scheme

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [National Highways](/buyers/national-highways/contract-awards)
- Contract winner: [BREEDON COLAS LIMITED](/contract-winners/breedon-colas/public-sector-contract-awards)
- Award value: £181,335
- Tender value: £181,335
- Award date: 15 April 2025
- Published: 24 September 2025
- Contract start: 13 June 2025
- Contract end: 6 February 2026
- Stage: awarded
- Procurement category: works
- Notice ID: ef593689-2f57-46a2-acfe-e2179507ba85-865281
- OCID: ocds-b5fd17-856cc2af-b265-4ab7-8e33-c027b59f0e4a

## Description

The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath\. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab\. The deck is split into two halves, separated by a longitudinal joint in the central reserve\. It is fixed at the west abutment and free at the east abutment\. The structure was commissioned in 1996 and has a design capacity of HA \+ 45HB\. During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing\. According to the Aone\+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise direction, near the elastomeric joint on the east side of the bridge\. The report also mentions that Volker Laser repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution\. There is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair\. Therefore, a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse\. Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology and programme\. The detailed design of the scheme has been completed by WSP

## Related contract awards

- [PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt](/contracts/ocds-b5fd17-17b0789c-c4e1-4d50-acd5-06e497aace8c): National Highways
- [PDF Framework - A27 Falmer Footbridge Headroom](/contracts/ocds-b5fd17-ac2eb537-ce78-41bb-8f91-d6d652725e96): National Highways
- [PDF Framework - RM1016 Holyport interchange](/contracts/ocds-b5fd17-c92e4616-bb2e-4533-8dce-53b55a72aa09): National Highways
- [PDF Framework - A64 Grimston to Hopgrove Pavement](/contracts/ocds-b5fd17-2ded18e4-f25d-4d20-8e8a-1a63ec5bd209): National Highways Limited
- [PDF Framework - A1\(M\) Catterick to Ripon NB](/contracts/ocds-b5fd17-ba1541ba-a484-46c6-aa99-76aa058ee43c): National Highways Limited
- [PDF Framework - A663 Chadderton Access](/contracts/ocds-b5fd17-cd10028d-385f-43f3-bf68-0bdc2e3ae486): National Highways Limited

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/ef593689-2f57-46a2-acfe-e2179507ba85-865281)