# Basic Asset Protection Agreement relating to Hartlepool Station Capacity Upgrade \(GRIP 1-3\)

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [TEES VALLEY COMBINED AUTHORITY](/buyers/tees-valley-combined-authority/contract-awards)
- Contract winner: [NETWORK RAIL INFRASTRUCTURE LIMITED](/contract-winners/network-rail-infrastructure/public-sector-contract-awards)
- Award value: £21,209
- Tender value: £21,209
- Award date: 5 January 2021
- Published: 20 April 2021
- Contract start: 5 January 2021
- Contract end: 31 May 2021
- Stage: awarded
- Procurement category: services
- Notice ID: 2ad3ddc0-a13a-4d4c-952f-26b329b459f1-429918
- OCID: ocds-b5fd17-845ff183-817f-4660-8e88-7fa15ae56c49

## Description

Provision of a Basic Asset Protection Agreement \(BAPA\) with Network Rail to support the GRIP 1-3 development work\. Network Rail Services for GRIP 1-3 development within the BAPA include: • provision of Network Rail sponsor support to provide guidance to the Customer; • preparation, facilitation and conclusion of any further agreements with the Customer; • provision of guidance on applicable Network Rail Procedures/Requirements and Standards; • provision of Network Rail record drawings and services information where available; • attendance at meetings; • review of method statement/risk assessments/ health and safety plans/ Asset Management Plans/ environment plans/ safety management plans; • appointment of project engineers for applicable engineering disciplines to undertake design review and acceptance or no objection where necessary; • issue of access permits or track visitor permits; • provision of site safety staff to ensure a safe system of work on Network Rail property; • review of Work Package Plans submitted by the Customer\.

## Related contract awards

- [GB-Darlington: TVCA-PROC-0917 - Legal Services - CRSTS Schemes](/contracts/ocds-b5fd17-2dafd459-ca2f-4499-859d-d5d8cb0ab32e): Tees Valley Combined Authority
- [TVCA-PROC-0901 - Legal Support](/contracts/ocds-b5fd17-36b054c8-d7f6-4e33-b4f4-258e799df2c8): TEES VALLEY COMBINED AUTHORITY
- [Finance and Audit Advice](/contracts/ocds-b5fd17-06211e50-7c3d-4153-bd1a-840f88171cff): Tees Valley Combined Authority
- [YNE Form C Network Rail BAPA Dutch River](/contracts/ocds-b5fd17-5e9864d4-7fcb-4381-8490-d77a8ae431c7): defra
- [Basic Asset Protection Agreement \(BAPA\) for Trackside Rail Inspections of 24 no\. KCC road bridges and footbridges that cross over Network Rail infrastructure planned for 2025/26 programme\. NR Reference Number: 184497 - ACE414589](/contracts/ocds-b5fd17-8d707846-87d5-430f-837d-43e9202df218): KENT COUNTY COUNCIL
- [Basic Asset Protection Agreement \(BAPA\) for Principal Bridge Inspections of 15 no\. KCC road bridges and footbridges that cross over Network Rail infrastructure planned for 2025/26 programme\. NR Reference Number: 184497 - ACE414590](/contracts/ocds-b5fd17-b56b5ba3-aba4-414f-a4b6-2e8609e73d6d): KENT COUNTY COUNCIL

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/2ad3ddc0-a13a-4d4c-952f-26b329b459f1-429918)
