GB-Shrewsbury: DMNH 016 - Shrewsbury Integrated Transport Package - Town Centre Package 1

Notice details

Published
Category
works
Buyer region
Not specified

Public buyer and contract winner

Public buyer

Shropshire Council
awarded to

Award value£1,100,000

  1. Awarded
    Completed
  2. Start
    Completed
  3. End
    Completed

Work description

NOTE: This notice was updated on 06 September 2018 for the following reason: The award to P Casey (Land Reclamation) Ltd. on 21st April 2018 did not proceed. Shropshire Council awarded the above contract to McPhillips (Wellington) Ltd. on 30th July 2018 Period of Work Start date: 10/09/2018 Period of Work End date: 19/04/2019(This is an award notice for Principal Contractors for the next phase of the Shrewsbury Integrated Transport Package, which consists of Public Realm Enhancements located at three separate sites along Town Walls, Murivance and Claremont Bank corridor as follows: •Town Walls/Belmont at the Crescent Lane junction. •Town Walls and Murivance in the vicinity of Swan Hill and St John's Hill. •St Chad's Terrace and Claremont Bank At these sites kerbs will be realigned to provide wider footways and new pedestrian crossing points. The footways will be repaved with high-quality natural stone and other conservation grade paving materials. The existing drainage will be upgraded where required and is planned to include sustainable attenuation measures where possible. The existing street lighting will be upgraded. Carriageway resurfacing will also be undertaken. Some new street furniture is proposed. The traffic signs along the entire length of Town Walls/Murivance/St Chad's Terrace/Claremont Bank is to be upgraded where required, with the creation of a new restricted parking zone. This will also entail the removal of the existing parking restriction markings.)

Related awards

Source: Contracts Finder · Notice 36b4d5db-f009-465f-825d-6689deb8791d-239193