Pre-procurement notice
Supply Chain Notice: BLD0366-01 Ship Hall Mega Doors
Notice details
- Published
- Category
- Not specified
- Buyer region
- South East
- Source
- View official notice
Public buyer
Public buyer
Ministry of DefenceTender value£500,000
- Planned startAs published in the notice
- Planned endAs published in the notice
Work description
Survey, Design & Installation of Ship Hall Mega Doors
Building 1/122 Ship Hall B was built in 2003. The north elevation has a large opening (circa 47.1 m x 32.3 m) completed by two vertical lift fabric doors, separated by a removeable central mullion. Both doors and mullion are in a poor material condition after 20 years, and the right-hand door (viewed from external) was damaged during a storm in November 2024. The aim of this project is to replace the doors and associated equipment.
The contractor shall develop a fully detailed and construction-ready design package that includes technical drawings, installation methodologies, and a comprehensive compliance plan to ensure all regulatory requirements are met. The design shall demonstrate a clear path for commissioning, testing, and integration with other systems.