South East New Energy (SENE) European Regional Development Fund (ERDF) Energy Retrofit Project
£917,000
Contract Details
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Hyde's intention in respect of this invitation to tender is for the installation of renewable technologies, equipment, and fabric measures in Hyde properties in Kent. The Contractor will generally be required to carry out the design and installation of renewable technologies and equipment, including Solar PV and Air Source Heat Pumps, as well as fabric measures, such as loft and cavity wall insulation, and ventilation measures. The works carried out must be compliant with PAS 2035:2019 and all installations must comply with PAS 2030:2019 requirements. Energy efficiency measures within the scope of PAS 2030:2019 must be delivered by installers who are certified to that standard for the measure to be installed. It is the role of the Retrofit Coordinator to ensure installers are competent and qualified to the required standards. The installer(s) of the measures must be TrustMark registered. Micro-Generation Scheme (MCS) certificates will be required where low carbon heating systems are installed.
Related Contracts
From This Buyer
From This Supplier
- ESPH526 Decarbonisation Managing Agent
£10,000,000 ·
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: 107553fa-31af-4ba6-ab83-2e9df5546617-621272 · Sourced from Contracts Finder
View source notice