# S30176 A12/A14 Copdock Interchange Traffic Survey Procurement &amp; Management

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [National Highways Limited](/buyers/national-highways-limited/contract-awards)
- Contract winner: Atkins Jacobs Joint Venture
- Award value: £205,113
- Tender value: £230,000
- Award date: 11 November 2026
- Published: 11 November 2026
- Contract start: 11 November 2026
- Contract end: 31 December 2026
- Stage: awarded
- Procurement category: services
- Notice ID: 7ccc8e08-6cfb-4030-a658-953a51dca346-921274
- OCID: ocds-b5fd17-50559335-a090-4427-8dc7-086b0f162121

## Description

The A12 / A14 Copdock Interchange is the key Strategic Road Network \(SRN\) junction serving Ipswich\. It connects the A14 with the A12 towards London and towards the East Coast\. Locally, it provides access to the town's main Park &amp; Ride site, out-of-town retail park and regional Sixth Form College\. The scheme will reduce journey times and congestion on the strategic routes connecting the Southeast, Midlands East, Anglia and, particularly, the port of Felixstowe\. Congestion and safety concerns at A12 / A14 Copdock Interchange were identified in Route Strategy reports from March 2017 and April 2014, with the junction experiencing high collision clusters and severe queuing during peak periods\. Initial Stage 0 work in 2018 recommended options for improvements and as a result, work commenced to develop a scheme under Road Investment Strategy 3 \(RIS3\) Pipeline Port Access scheme\. A number of possible solutions were considered during PCF Stage 1 and two options were then taken forward into PCF Stage 2\. A non statutory public consultation held in the autumn of 2021 and following the consultation, further assessments and consideration of alternatives was undertaken\. A recommended option was selected, which was still subject to approvals, for a Preferred Route Announcement \(PRA\)\. In the Autumn of 2022, the decision was made to pause the A12 / A14 Copdock Interchange project\. Scheme has been included in RIS3 as part of the pipeline of potential schemes for RIS4, however, it remains uncommitted at this stage\. Given the time that has elapsed, a review and update \(where necessary\) of the previous Stage 1 and Stage 2 work is required\.

## Related contract awards

- [South East White Salt Order 5](/contracts/ocds-b5fd17-63940478-c0f7-4042-97a0-d8718ddae766): National Highways Limited
- [PDF Framework - M60 J6 CW HS Depression](/contracts/ocds-b5fd17-0d88a228-3913-4a25-9162-72f2e66f9dbe): National Highways Limited
- [S30162 Drone Operating Standards &amp; Requirements 2026-31](/contracts/ocds-b5fd17-a459d466-3307-40aa-9d98-18043cb2a524): National Highways Limited
- [S30075b Third Generation South East Regional Traffic Model Build](/contracts/ocds-b5fd17-ca57cdc3-7484-4573-ab9a-86f8033a7182): National Highways Limited
- [S30069 Signal Setting Rules Safety Risk Assessment](/contracts/ocds-b5fd17-8e1fe478-45e1-475e-891f-38f6233508f1): National Highways Limited
- [S30008 Junction Safety](/contracts/ocds-b5fd17-12f25a97-03bb-4260-9a6d-8642a3cbad39): National Highways

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/7ccc8e08-6cfb-4030-a658-953a51dca346-921274)