WP4693 Dungeness A Desiccant and Catalyst

Notice details

Published
Category
Not specified
Buyer region
North West

Public buyer and contract winner

awarded to

Contract winner

NSG Environmental Ltd

Award value£82,987

  1. Awarded
    Completed
  2. Start
    Completed
  3. End
    Completed

Work description

The Dungeness A reactors shut down in December 2006. Since that time desiccant and catalyst have remained within 14 vessels but have not been in operation. The function of the desiccant material was to absorb moisture from the primary carbon dioxide cooling gas. As a result, the desiccant is likely to be heavily contaminated with tritium in the form of adsorbed tritiated water. The catalyst material will be similarly contaminated. The Phase 1 analysis will determine if there are significant quantities of active contaminants other than tritium. If such contaminants are present, it is expected that the Phase 2 analysis will quantify these. Provision of Transport packaging and courier services between DNA site and the ASP primary laboratory are required

Related awards

Source: Contracts Finder · Notice 415fb8bd-fbe2-4777-999d-a1255ea4681a-634113

View source notice