# CPSP 144 A12 to A120 Widening - DIP estimate review, A66 NTP - Stage 3 Estimate, M3 J9 - VE Works, RIS3 Pipeline Inflation &amp; HS2 - M6

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: Highways England
- Contract winner: [Benchmark Estimating](/contract-winners/benchmark-estimating/public-sector-contract-awards)
- Award value: £65,452
- Tender value: £65,452
- Award date: 8 March 2021
- Published: 29 March 2021
- Contract start: 8 March 2021
- Contract end: 31 March 2021
- Stage: awarded
- Procurement category: services
- Notice ID: 7792755d-70c0-476a-8fcb-6913d6a56dfe-424212
- OCID: ocds-b5fd17-4b59fc11-c57c-42a5-a9dc-6bdf1ccf3a48

## Description

A12 to A120 Widening - DIP estimate review Following the latest revision of the cost estimate and draft DIP budget, the DIP have submitted a budget that is in excess of the available funds\. The project team have been asked Cost Planning to review the submission prepared by the DIP to understand where the differences lie\. Initially there will be check of the reference data to ensure that there is consistency between the two estimates\. Further involvement by the CPSP on the estimate checks/reviews will be instructed by the Estimating Manager\. Attendance and participation at project team meetings is requested of the CPSP to complete this works\. Follow on work is likely to be required also under this request\. A66 NTP - Stage 3 Estimate Scope is likely to exceed that of a standard Developing Estimate given it is a Tier 1 scheme\. This will likely involved additional outputs being produced for the project team as well as more attendance at internal meetings\. M3 J9 - VE Works Following the latest revision of the cost estimate and draft DIP budget, the DIP have submitted a budget that is in excess of the available funds\. The project team, along with the DIP have been asked to explore whether there are any value engineering opportunities in the scheme's design\. Attendance and participation is requested of the CPSP to complete this works\. Follow on work is likely to be required also under this request\. RIS3 Pipeline Inflation - Using the an updated inflation profile to be provided by Highways England, re-calculate the value of inflation across all schemes within the RIS 3 portfolio - Approach to be assured by Highways England before release to HoCP - Table outputs and report them back to the HoCP HS2 - M6 J15 - Provide the HS2 team with some high-level costs of construction for two proposed layouts to Junction 15 on the M6 - Outputs are required within a 2-week timescale - Due to this compressed deadline, it was agreed that only the cost of construction comprising; direct works, indirect works, unscheduled item allowance and contractor fee, would be produced for this request\.

## Related contract awards

- [Nursery Supplies](/contracts/ocds-b5fd17-ec45916c-27dd-4c3b-a3a6-335f3efb98cc): Highways England
- [National Highways Fresnel Lens Distribution 2022](/contracts/ocds-b5fd17-aef9e374-f2f6-43a4-abf2-eb13b2ed84c8): Highways England
- [Contract Awarded for Motorway Service Area Energy Storage Systems](/contracts/ocds-b5fd17-ab9a65cf-dbd4-4ef1-83a4-69c5e9fb06f9): Highways England
- [ITEP0634 - Carbon &amp; Cost Estimating Software 24/25](/contracts/ocds-b5fd17-08ebee1f-914b-40eb-999d-800a9008dc11): National Highways Limited
- [Task Order from Cost Estimating Framework for CEF02-package 5 - Cost estimating support from Benchmark Estimating / MI Engineers for FY 25/26 on various schemes](/contracts/ocds-b5fd17-f9d164a8-5d1a-42e7-8179-aefd02214f6c): National Highways Limited
- [CEF02-package 4 - Cost estimating support from Benchmark Estimating for FY 25/26 on various current and future RIS projects](/contracts/ocds-b5fd17-6e7522ff-842f-439c-bd20-b095425e1af5): National Highways

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/7792755d-70c0-476a-8fcb-6913d6a56dfe-424212)