Skip to content

Tender notice

Provision of a Smart Grid and Transmission Line Test Rig(s) for the University of Sunderland

Notice details

Published
Category
goods
Buyer region
North East

Public buyer

Tender valueNot disclosed

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

The School of Engineering at the University is looking to purchase a smart grid and transmission line test rig(s) setup which is suitable for:

o All test rig or rigs should come with both the necessary and additional recommended test equipment, software, power supply/supplies and accessories to ensure full functionality of the test rig(s) system. o Modular integration of renewable energies test rigs where applicable. o Each test rig frame panel should be width <1300mm, depth <800mm and height <2000mm. o All relevant electrical and mechanical safety considerations built into the design. o To be supplied with interactive/multimedia training course materials/operating instructions from the manufacture. o Be able to perform a range of experiments on the rig(s) including three-phase busbar, coupling, open-circuit transmission, circuit breaker overtime behaviours. o Be able to perform a range of experiments on the rig(s) including complex loads, load monitoring and power consumption analysis - using a range of resistance, induction, and capacitance loads. o Allow for the investigation of dynamically alternating loads, power generation and intelligent energy management. o Allow for the investigations of three-phase transmission lines, cables, earth-fault compensation, power networks, load voltage regulation and protection overvoltage/undervoltage. o Have a wind power plant facility which allows for synchronisation to the grid. o Measuring instrumentation to be provided with various communication interfaces to allow for PC control from user input. o Power Engineering software must be provided for the intelligent control and evaluation of smart grids, with necessary displays(s). o Power Engineering software to allow for simulation work where appropriate.

The necessary software and any training manuals/exercises for students to complete when in the laboratory environment must be supplied in electronic format

The warranty period must be a minimum of one year.

Additional information: Is a Recurrent Procurement Type? : No

Related awards

Source: Contracts Finder · Notice 70547173-ec0f-42f0-92cd-4931c800c298-565101

View source notice