Contract award record

HMP Bedford Fire Safety Improvements (RETENDER) - BPRN 508/16/1123

Notice details

Published
Category
works
Buyer region
London

Public buyer and contract winner

awarded to

Contract winner

Kier Construction Ltd

Award value£1,383,894

  1. Awarded
    Completed
  2. Start
    Current phase
  3. End
    Upcoming

Work description

- Total replacement of the current Fire Safety systems within the built environment (ie site wide) , utilising hard wired system. - Furthermore, the integration of a number of sustainability initiatives including; replacement of LED lighting, introduction of lighting controls and water saving initiatives.

A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £1,383,894. It is expected that the total construction cost of the project will be c£14m.