# Embedded rock ramp fish pass at the weir downstream Pincroft weir

> A sourced UK public sector contract award published by RIBBLE CATCHMENT CONSERVATION TRUST LIMITED.

## Key facts

- Buyer: RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- Supplier: [JOHN WADE GROUNDWORKS LIMITED](/suppliers/john-wade-groundworks/public-sector-contract-awards)
- Award value: £35,386
- Tender value: £63,000
- Award date: 1 July 2020
- Published: 15 October 2020
- Contract start: 23 July 2020
- Contract end: 30 September 2020
- Stage: awarded
- Procurement category: works
- Notice ID: 6df8f5aa-b4cd-48cb-be16-9e7150b42c2f-387407
- OCID: ocds-b5fd17-28ca0517-9b92-4a92-ae5d-eeec7bd678e7

## Description

The Opening Up the River Douglas programme \(OUR Douglas\), funded by the European Regional Development Fund \(ERDF\), aims to specifically address and improve fish passage in the Douglas Catchment, creating a fish easement which allows for the passage of all fish species at all times\. As such the project is advertising this contract opportunity for the construction of an embedded rock ramp fish pass at the weir downstream of Pincroft\. Although these works are below the thresholds for a full procurement procedure under the Public Contracts Regulations 2015 -RRT is still under and obligation to ensure compliance with EU principles of transparency, equality and non-discrimination, as such RRT is conducting a formal tender process in which all bidders will be treated equally, with no discrimination and through a transparent process\. Additional information: Tender Documents available here: https://ribbletrust\.org\.uk/contract-opportunities/our-douglas-contract-opportunity-2/

## Related contract awards

- [Design and Construction Weir Removal at Cobbs Clough Weir](/contracts/ocds-b5fd17-7b71daa8-0da8-4089-9a69-d9a2110c3341) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Design and Construction Rock Ramp Fish Pass at Worthington Lakes](/contracts/ocds-b5fd17-f83d6e7f-4d98-4d1a-a0f0-5b3ae263da67) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Construction Embedded rock ramp fish pash near Red Rock](/contracts/ocds-b5fd17-3e56ab93-4bc6-494f-86ee-5fcb554f9b83) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Design and Construction Rock Ramp Fish Pass Upstream Pincroft Works](/contracts/ocds-b5fd17-f0e0330b-982f-4571-ab92-729e981ca797) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Loose fill rock ramp fish pass at the weir downstream of Grimeford Lane](/contracts/ocds-b5fd17-d07d3eb1-8f0d-4b25-9b3a-15d01871ed39) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Milnshaw Park provision of a new play area, Lancs](/contracts/ocds-b5fd17-f0d39529-6f73-4af2-a515-3b607ee1cd1e) — Hyndburn Borough Council
- [Forrest Hills demolition and building works](/contracts/ocds-b5fd17-e776b8bb-18d2-4e90-a856-4007849537d3) — Lancaster University
- [Construction of Rock Ramp Fish Easement, Hoghton Bottoms](/contracts/ocds-b5fd17-6d5a33f6-238f-4ee0-96d7-83413f094f98) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Installation Services, Small Works and Reactive Call Outs](/contracts/ocds-b5fd17-9a3a801b-3d9b-45bd-a1c0-330f57949444) — Gloucestershire Health and Care NHS Foundation Trust
- [M62 Red Lane Dike Bridge Refurbishment - Ground Investigation](/contracts/ocds-b5fd17-199f371a-d0db-473e-a734-b33746969b76) — National Highways Limited
- [Ebury Phase 2 Marking Suite Fitout Contractor](/contracts/ocds-b5fd17-34a84eb0-f527-44ce-bd81-cc5dc466edb4) — Westminster City Council
- [CA18338 - Chesterfield College Training &amp; Production kitchen ducting, heating and control panel](/contracts/ocds-b5fd17-a18f2594-e9d1-44d8-bb84-af476f45d642) — Chesterfield College

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/6df8f5aa-b4cd-48cb-be16-9e7150b42c2f-387407)