# S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators

> A sourced UK public sector contract award published by National Highways Limited.

## Key facts

- Buyer: [National Highways Limited](/buyers/national-highways-limited/contract-awards)
- Supplier: [WSP UK LTD](/suppliers/wsp-uk/public-sector-contract-awards)
- Award value: £99,857
- Tender value: £100,000
- Award date: 3 August 2026
- Published: 6 August 2026
- Contract start: 3 August 2026
- Contract end: 31 March 2027
- Stage: awarded
- Procurement category: services
- Notice ID: 0f8791e2-6bbe-4302-85a5-5faa5885d8cd-909620
- OCID: ocds-b5fd17-1d70e25a-3a5a-4416-a448-558c8f77576a

## Description

National Highways Strategic Safety Team in the Road Safety Division want to procure through the SPaTS 3 framework a Direct Award to WSP for the continued development of Lead Safety Indicators \(LSIs\) project \(T0631\) through a re validating and verification stage\. In the National Highways 2024-25 annual delivery plan we committed to developing a set of LSIs\. ORR is following progress on this\. It is understood that DfT is expecting at least one lead safety indicator \(in addition to the existing iRAP metric\) to be added to our formal organisational performance metrics during RIS3\. National Highways' key performance indicator for road user safety on the Strategic Road Network \(SRN\) \(KPI1\) is a lagging indicator, focused on impacts\. A lagging indicator is reactive in nature and measures the performance of an aspiration or outcome after an event has occurred\. They don't tell us how we're performing at preventing casualties and reducing future collision severity\. There is also a time lag of knowing the results of a lagging indicator, for example, 2024 stats 19 data was published on 25 September 2025\. Although measurable and quantifiable, lagging indicators alone are not enough, and they don't provide insight into factors that lead to those outcomes without in-depth analysis\. LSIs are proactive, preventive measures \(or metrics\) used to shed light on the level of safety performance achieved in a system through monitoring and intervention\. A lead indicator attempts to measure control and preventative activities that precede or indicate likely failures\. They are designed to understand what is happening earlier in the process in order to prevent and control lagging indicators\. Therefore, to improve road safety on the SRN \(and reduce KSIs\), there is a need to identify, monitor and positively influence LSIs\. Our iRAP performance indicator \(percentage of traffic using iRAP 3 star or above rated roads, and flow-weighted decimal star rating\) is a lead indicator, but as we are only able to conduct a full survey once every 5 years, we need additional measures that can provide earlier and more frequent indication of safety performance and therefore any need for change in approach or additional intervention within the 5 year period\.

## Related contract awards

- [ORT0173 CCTV RIS 3 Telent](/contracts/ocds-b5fd17-6083ef6d-0a21-4407-a444-1bfdf9360140) — National Highways Limited
- [ORT0173 CCTV RIS 3 SWARCO](/contracts/ocds-b5fd17-b121134c-1e16-4a21-acd2-2746f4a6e2f7) — National Highways Limited
- [A36 Bemerton to St Paul's roundabout incl Castle roundabout Bundle MM](/contracts/ocds-b5fd17-dfb2cc0e-39d4-444f-92c5-5cf9c2c2b77a) — National Highways Limited
- [PDF Framework - A38 Whitecleave and Mardle Bundle - construction](/contracts/ocds-b5fd17-8a2a8a7c-0a58-4750-99ae-a9c0448ba607) — National Highways Limited
- [S30131 Deliver New Lorry Parking](/contracts/ocds-b5fd17-99579aef-cafc-44eb-9b80-5d118ce8757a) — National Highways Limited
- [S30075a Third Generation North Regional Traffic Model Build](/contracts/ocds-b5fd17-c4fda139-90e8-467f-82c3-28523a117aaa) — National Highways Limited
- [PSF 4 Lot 2B- Connected Cleator Moor Detailed Design](/contracts/ocds-b5fd17-89914eba-156e-429b-a3d8-f7a4296f9783) — Cumberland Council
- [Strategic Outline Case and ES1-2 Design Services for Adderley Park Station](/contracts/ocds-b5fd17-16101758-bae4-4aee-8834-a3eff0face4b) — West Midlands Combined Authority
- [Taxi and MPV \(1-8 seats\) Passenger Assistant - Taxi and MPV \(1-8 seats\) Passenger Assistant](/contracts/ocds-b5fd17-72db28b1-c882-4e40-8470-acd916a51a98) — East Sussex County Council
- [QLT354 2026-08-26 \(0900\) Leiston - Roman Hill Primary School, Lowestoft \(4 seats and a PA\) - AWARD](/contracts/ocds-b5fd17-3418d9ed-524a-41de-8487-25e33a827cf8) — Suffolk County Council Passenger Transport
- [QBR087 2026-08-26 \(0900\) Lowestoft / Worlingham - The Woodview Project, Worlingham \(6 seats and a PA\) - AWARD](/contracts/ocds-b5fd17-75a81455-cf68-41f3-8b47-ece5ddb308f0) — Suffolk County Council Passenger Transport
- [QOC940 2026-08-25 \(0900\) Lowestoft - Ness Point School, Gt Yarmouth \(4 seats\) - AWARD](/contracts/ocds-b5fd17-4dc15fef-5535-4fdf-b910-40ae6110e71d) — Suffolk County Council Passenger Transport

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/0f8791e2-6bbe-4302-85a5-5faa5885d8cd-909620)
