ROW Winterhay Farm Footbridge, Ilminster (1825)
£88,950
Contract Details
- Tender Value
- £88,950
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The footbridge currently present at this location is steel beamed with concrete block deck with timber handrails. In addition, a masonry abutment from a historic structure is present on the eastern bank. The footpath at this location is CH 14/11. These works are to include: • Provision of photographic condition survey of bridge area and proposed access routes. • Provision of current mid soffit height to invert. • Removal of existing abutments and reprofiling of southern bank to an approximately 45⁰ gradient. • Stabilise reprofiled surfaces of southern bank using natural materials (e.g., rock rolls below water level and biodegradable geotextile above). • Install new standard concrete pads. • Supply and install 1No. 15m span standard steel framed/timber clad footbridge. • Install steps either side of bridge with timber handrails. • Install gates at either end of bridge.
Related Contracts
From This Buyer
- Keyford Court Refurbishment
£396,542 ·
- Glovers Walk Demolition
£923,944 ·
- Management of Shared Lives Scheme
£2,730,000 ·
- Flat Roof Maintenance Works - Fairmead School
£166,365 ·
Ref: 7c7ae502-5199-4825-be94-19e74a60b318-779489 · Sourced from Contracts Finder
View source notice