Skip to content

Tender notice

Fit Out - Lift Steelwork & Glazing -WP12.2.1 - Old Oak Common (S4) Station Re-open

Notice details

Published
Category
works
Buyer region
East of England

Public buyer

Tender value£20,000,000

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

NOTE: THIS IS A RE-OPENED OPPORTUNITY

IF YOU RESPONSED TO THE ORIGINAL ADVERT YOU DO NOT NEED TO RESPOND TO THIS ADVERT.

WP12.2.1 - HS2 Lift Steelwork & Glazing Scope of Work: The OOC Station HS2 Scenic Lifts Fit Out package consists of the primary steelwork and cladding to the OOC HS2 station scenic lifts and comprises of the following scope:

• Detailed design, supply and installation of primary steelwork and glazed cladding to 12 scenic + 3 interchange lifts in the HS2 station platforms and concourse area, including provision of brackets, supports and required service holes to interfacing contractors. • Fully coordinated design with MEPH services, advertising, signage, station common components and lifts contractor, including design of brackets, supports and allowance for service holes. • Provide RIBA 5 design and construction drawings including connection details, fabrication drawings, general arrangements, and elevation drawings for construction.

Additional information: No Documentation is included at this point.

Related awards

Source: Contracts Finder · Notice 3d7fe79a-8771-4d40-910e-197ceb12543a-642261

View source notice