# Green Distilleries Competition: Phase 2

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [Business Energy and Industrial Strategy](/buyers/business-energy-and-industrial-strategy/contract-awards)
- Contract winner: Locogen Ltd
- Award value: £3,000,000
- Tender value: £3,000,000
- Award date: 5 October 2021
- Published: 23 November 2021
- Contract start: 5 October 2021
- Contract end: 30 June 2023
- Stage: awarded
- Procurement category: services
- Notice ID: c28b6236-36a7-4fa8-bb03-6e16c83ef5fd-487933
- OCID: ocds-b5fd17-0b48d20f-6a0a-4c69-b558-586bf5cb5645

## Description

The Green Distilleries Programme is a £12\.33m Competition, which falls under the £1b Net Zero Innovation Portfolio which was announced as part of the government's 10-point plan in 2020\. The Net Zero Innovation Portfolio will accelerate the commercialisation of innovative low-carbon technologies, systems and processes in the power, buildings and industrial sectors\. The Green Distilleries Competition aims to facilitate the least cost and maximum value-added transition pathways to a lower-carbon economy\. As the majority of distillery emissions come from generating heat \(70% of the distillation industry's energy demand\), this competition will focus on fuel switching\. Stimulating early investment in the processes and technologies required for fuel switching to low carbon fuels for heat will directly impact the cost of decarbonising industry, heat, power, and transport\. The Green Distilleries Competition is run in two Phases \(feasibility and demonstration projects\) and is split into two separate Lots \(Lot 1 - will focus on fuel switching of the process and onsite power production, Lot 2 - will focus on innovation around fuel switch enabling technologies such as fuel conversion, transport and storage\)\. £1\.01m was awarded to 17 Phase 1 \(feasibility studies\) projects and ended on 31/03/2021\. Phase 2 is providing up to £3,000,000 per project and will be funding 4 projects until 30/06/2023, during which successful projects can continue the development of their technology through to demonstration\.

## Related contract awards

- [Heat Network Efficiency Scheme - HNES MAIN](/contracts/ocds-b5fd17-ff1b5f5e-3982-4e39-b7c9-d2d23fdc232d): Business Energy and Industrial Strategy
- [Re-procurement of Hydrogen Legal Advisors](/contracts/ocds-b5fd17-48dee1e9-b7ac-43b0-a88c-f8a217ce2a34): Business Energy and Industrial Strategy
- [Sizewell C Legal Services Contract](/contracts/ocds-b5fd17-ac9c6e71-605a-4360-a5a4-5b24c0628cf8): Business Energy and Industrial Strategy
- [Chamber House Solar Farm - Owners Engineer Services \(Modification\)](/contracts/ocds-b5fd17-f3256f16-55fc-420f-9db5-0043223d2702): Rochdale Metropolitan Borough Council
- [Allington Solar Park Development](/contracts/ocds-b5fd17-93f29c86-6142-4d80-b915-d920070e07cd): Eastleigh Borough Council
- [Glastonbury Clean Energy Project Phase 1 \(Feasibility\)](/contracts/ocds-b5fd17-48064bb3-e887-4296-b9bc-2a59982b5892): Mendip District Council

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/c28b6236-36a7-4fa8-bb03-6e16c83ef5fd-487933)
